Бесплатно по России
8 800 444 40 90

Tank for transportation ofparaffin on chassis GAZ NEXT C41RB3

Other, Tank trucks for transportation of food fluids

Type
4*2
Cruise control
+
ABS+ASR+EBD
+
Steering booster
+
Automatic transmission
+
Central lock
+
On-board computer
+
Electrowindows
+
Electroheating of exterior mirrors of rear view
+
Driver's sitting with armrest
+
Radiator heater
+
Rear suspension with pneumatic elastic elements with the control board on sitting of the driver
+
Tank
for paraffin
Nominal capacity
7000 liters
Quantity of sections
1 piece
The transported product Synthetic paraffin, firmness
0.9 kg/dm3
Filling coefficient
80%
Tank material
Noncorrosive food steel
Wall thickness
3 mm
Material of external covering of tank
Sheet of mirror noncorrosive steel
Heat insulation
Polyurethane foam
Heat insulation thickness
50 mm
Inner diameter of the pipe duct (conditional)
Du 80,mm
Tank filler Diameter
500 mm
Respiratory valve
on tank filler
Ecological box against the spil
of product
System of discharge
Gravitational discharge via the hand-operated mechanical ground valve and rotary lock Du80
Ground valve holds the transported liquid in the warmed part
of tank
Discharge is removed in communication box
+
Pressure head soaking up sleeves
case for sleeve Du 80 (L = 4.5 m x 1 piece), KAMLOK BRS
Service platform
nonskid service platform on the right side of tank
Entrance on the platform
on ladder behind
Section
of tank Constant elliptic section
The allowed maximum mass
10,000 kg.
Weight without loading
5,000 kg.
Number
of places 2+1
Dimensions
7,910 x 2,500 x 2,500 mm
Applied fuel Diesel fuel
+
System of heating up
In tank cut-in heaters with power of 18 kW, with power supply from fixed network 380B are installed
The electro case with 2 socket connections for power connection of 380 V. is established on tank
heaters are provided by the Buyer
Spark arrester
on the muffler
Place of fastening
of grounding
Antiretractable boots
+
The fire extinguisher cylinder
risk for level control of the transported liquid in tank
Temperature indicator
Additional drain valve Du 32 in rear part of the tank on the face side

Процесс заказа спецтехники

Основные этапы нашей работы

1
Профконсультации
по спецавтомобилям
и оборудования
2
Конференс связь
с Заказчиком
3
Предоставляется индивидуальная скидка
4
Заключение договора (контракта)
5
Согласование модели 3D
с конструкторским отделом
6
Запуск
производсвенного цикла
7
Уведомление
о готовности
8
Согласование
даты отгрузки
9
Услуги
доставки
на вверх