Car on chassis GAS 3309, 15-20 places

Base chassis GAZ 3309

Double-tire wheels
Wheel formula 4x2
- Engine MMZ D.245.7E (euro 4, 119 HP.)/ YAMZ-534 (euro 4, 134 HP.)
-Fuel type – diesel
Steering booster, ABS
Fuel tank 105 liters
Tow bar with winch
Cabin for two seats
Colour – white

Equipment in cabin:

Equipment in cabin:
USB radio tape recorder+ 2 speakers+ antenna;
Metal canister, 20 liters;
Winch, 6.5 t.;
Light on the roof;
Plastic madflaps;
Tow bar;
GPS Glonas;
Tachograph Drive 5.
Set of driver.

Additional equipment in the van:

Air conditioner
Lockers under seats
Low entrance
Hand-rail
Toning of glasses
Curtains
Folding seats
MP3 radio tape recorder with distributing on cabin and van
Coloring of cabin and the van in any color scale
Drawing logos and other graphics
Mechanical winch
Luggage compartment on roof of the van
And many other things
The complete set of the van can change depending on the Customer's wish.
Production time of the individual order from 3 up to 7 working days.
Basic equipment always available!
Our organization offers service - Delivery of Car to Client. Car goes by railway transport or self-feed. Professional drivers will deliver car quickly, reliably and qualitatively.

Characteristic of the standard van " Crew Bus on 15/20 Places":

Van type – frame;
Dimensions – 3720х2380х2100 mm.;
External covering - plated metal, colour – green/white;
Internal covering – decorative fibreboard, colour – gray/brown
Warming –polystyrene, 40 mm.;
Doors – side single, rear single;
Ladder;
Windows – 7 pieces: 1 sliding, 6 deaf;
Lighting – 2 ceiling plafonds;
Floor – plywood, 21 mm., linoleum/rubber,
Seats soft high (velour, gray colour) – 20/15 pieces;
Seat belts, two-point;
Heater Planar 4D-24
Buzzer (button of call of driver);
Emergency hatch;
Holder of spare wheel (on rear wall of the van).

The process of ordering machinery

1
Consultation on the car and equipment
2
Conference call with the Customer
3
Individual discount available
4
Conclusion of an agreement (contract)
5
Reconcile the 3D model with the design department
6
Start the production cycle
7
Readiness alert
8
Shipment date negotiation
9
Delivery
Services